Skip to main content

ASB

ASB // Renovation of the Amsinckstraßen bridge over the Mittelkanal in Hamburg.

Aerial view of demolition
Cutting and lifting of prestressed concrete bean
Aerial view of demolition

As part of revitalization of the Amsinckstrassenbrücke, a 1956, two-span prestressed concrete bridge over the Mittelkanal, was demolished.

OUR SERVICES
Concept design until detailed design

Size
Bridge span: 2 x 17m
Width: 43m

FEATURES IN KEYWORDS
Recalculation of the prestressed concrete girders for the new dismantling and transport condition taking into account the bridge damage